Renovation electrical work covers any changes to the electrical installation required as part of a home renovation project. This includes adding new power points and lighting circuits, moving or adding switchboard circuits to support new loads (kitchen appliances, bathroom heating, air conditioning), running new wiring through opened walls and ceilings, and fitting electrical components at the end of the build.
In NSW, all additions and alterations to a home's electrical installation must be carried out by a licensed electrician. This applies equally to a single new power point and a full whole-home rewire. The work is notifiable to NSW Fair Trading and requires a Certificate of Compliance for Electrical Work (CCEW) for the completed installation.
The most common mistake homeowners make is engaging an electrician too late in the renovation process. Rough-in wiring (running cables before wall lining) needs to happen before plastering or tiling. If electrical work is needed after walls are complete, access costs increase significantly. We work alongside your builder, plumber, and other trades to coordinate rough-in timing and avoid rework.